Sign in
OPERATING A 250 KW LANDFILL GAS FIRED MICROTURBINE AT A 0.4 HECTARE RESEARCH AND DEMONSTRATION GREENHOUSE
Journal article   Peer reviewed

OPERATING A 250 KW LANDFILL GAS FIRED MICROTURBINE AT A 0.4 HECTARE RESEARCH AND DEMONSTRATION GREENHOUSE

A.J Both, T.O Manning, A Martin, D.R Specca and E Reiss
Acta horticulturae, Vol.893(893), pp.397-404
04/2011

Details